Posted By: Carol_Hill
Orient "carbets" infrastructure complete - 10/17/2019 04:59 PM
...or so says the Daily Herald, anyway.
Daily Herald story
I could be wrong, often am, but I don't see that the carbets will be open this high season, except the one next to the end closest to where Club O was.
This is that building, photo taken on October 5, 2019. Interesting that the picture in the DH is old, because the building is not painted in the DH picture
Of the other units, they have only even started any construction on I believe 4 of them. Here are some pictures of the area. I believe two of the four under construction are Chez Leandra and Orange Fever.
Oh and if you take a look at the picture of the bathroom in one of the shots, there is a big hole in the side of the roof. And there was garbage piled in the bathroom. Something could have changed since we took those pictures, but somehow, I don't think that the bathrooms are quite ready to go...
Daily Herald story
I could be wrong, often am, but I don't see that the carbets will be open this high season, except the one next to the end closest to where Club O was.
This is that building, photo taken on October 5, 2019. Interesting that the picture in the DH is old, because the building is not painted in the DH picture
Of the other units, they have only even started any construction on I believe 4 of them. Here are some pictures of the area. I believe two of the four under construction are Chez Leandra and Orange Fever.
Oh and if you take a look at the picture of the bathroom in one of the shots, there is a big hole in the side of the roof. And there was garbage piled in the bathroom. Something could have changed since we took those pictures, but somehow, I don't think that the bathrooms are quite ready to go...