TravelTalkOnline

Progress on the airport

Posted By: candj

Progress on the airport - 09/06/2018 10:56 AM

According to the article in the Daily Herald, the departures and arrivals will be moved over to the regular airport in November. joy

https://www.thedailyherald.sx/islands/80331-rebuilding-of-airport-terminal-on-schedule
Posted By: RonDon

Re: Progress on the airport - 09/06/2018 12:11 PM

Great news!
Posted By: Carol_Hill

Re: Progress on the airport - 09/06/2018 01:17 PM

I was very skeptical when they announced this plan to be back in the bottom floor of the main terminal by November. It looks like I will be proven wrong, which would be GREAT. SXM Airport needs to get back on a more even keel.
Posted By: ruralcarrier

Re: Progress on the airport - 09/06/2018 01:35 PM

Perhaps Diamond Resorts should consider hiring workers like the ones doing the airport.

I do hope the airport gets back on track as scheduled.
Posted By: SXMScubaman

Re: Progress on the airport - 09/06/2018 03:21 PM

I believe the airport terminal is a much smaller project than all the rooms that Diamond has to start from scratch on in both resorts.
© 2024 TravelTalkOnline