Progress on the airport - 09/06/2018 10:56 AM
According to the article in the Daily Herald, the departures and arrivals will be moved over to the regular airport in November.
https://www.thedailyherald.sx/islands/80331-rebuilding-of-airport-terminal-on-schedule
Posted By: Carol_Hill
Re: Progress on the airport - 09/06/2018 01:17 PM
I was very skeptical when they announced this plan to be back in the bottom floor of the main terminal by November. It looks like I will be proven wrong, which would be GREAT. SXM Airport needs to get back on a more even keel.
Posted By: ruralcarrier
Re: Progress on the airport - 09/06/2018 01:35 PM
Perhaps Diamond Resorts should consider hiring workers like the ones doing the airport.
I do hope the airport gets back on track as scheduled.
Posted By: SXMScubaman
Re: Progress on the airport - 09/06/2018 03:21 PM
I believe the airport terminal is a much smaller project than all the rooms that Diamond has to start from scratch on in both resorts.