Yeah, the basic structure at RP is poured concrete. I doubt it was significantly affected, but the interiors could be more or less gutted. And the timing is almost certainly going to be affected by two important considerations (actually three) that go beyond simply how much work there is, and how long would it take to perform it. One, availability of materials. Two, availability of skilled labor. Three, $$$.