We stayed at Mt Veron for six weeks ending March 17th. While we were there they removed the green roofing from most of the buildings with flat roofs.under it. They were waterproofed with some kind of paint. The place where the wiring goes down to each group of units was covered and sealded. The replacement of the green roofs will come much later. The bridge walkways were all repaired if damaged. DI'd not match the existing railing but we're safe and secure. The plantings were making a comeback. In the six weeks we were there you could see alot of new growth and more blossoms.The buildings needed a good paint job before Irma more so now. But it will happen eventually. The pool area is a disaster, but there is easy access to the beach there. Some of the hand railings on the short cuts are missing. The lights along the walkways were out. We were given flashlights.
In our six weeks we saw a noticeable inprovement. It is going to take a long time to complete what they hope to get done. We are go with the flow people we ejoyed our time there. Made our reservations for 2019. Hope this helps.