...or so says the Daily Herald, anyway.

Daily Herald story

I could be wrong, often am, but I don't see that the carbets will be open this high season, except the one next to the end closest to where Club O was.

This is that building, photo taken on October 5, 2019. Interesting that the picture in the DH is old, because the building is not painted in the DH picture

[Linked Image]

Of the other units, they have only even started any construction on I believe 4 of them. Here are some pictures of the area. I believe two of the four under construction are Chez Leandra and Orange Fever.

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

Oh and if you take a look at the picture of the bathroom in one of the shots, there is a big hole in the side of the roof. And there was garbage piled in the bathroom. Something could have changed since we took those pictures, but somehow, I don't think that the bathrooms are quite ready to go...




Carol Hill