The schedule that is in place is that building 7 to be done with plumbing, electrical etc and then it's building 6 then building 3 and 4 to have the same done. Everything starts in building 7 then proceeds to the other three in that order as stated in the update link I posted earlier if you want to read it. All are supposed to open at the same time.