Originally Posted by Carol_Hill
panman--just talked to JD on the phone and the generator was on at Horny Toad--although I don't see Simpson Bay listed on the loadshedding schedule yet.

That shouldn't surprise you too much. Has GEBE really followed their schedule?
" 𝙏𝙝𝙚𝙧𝙚 𝙞𝙨 𝙖 𝙥𝙤𝙨𝙨𝙞𝙗𝙞𝙡𝙞𝙩𝙮 𝙩𝙝𝙖𝙩 𝙨𝙤𝙢𝙚 𝙖𝙧𝙚𝙖𝙨 𝙢𝙖𝙮 𝙚𝙭𝙥𝙚𝙧𝙞𝙚𝙣𝙘𝙚 𝙤𝙪𝙩𝙖𝙜𝙚𝙨 𝙡𝙤𝙣𝙜𝙚𝙧 𝙩𝙝𝙖𝙣 𝙨𝙩𝙖𝙩𝙚𝙙 and there may be deviations from the schedule due to varying load demands. The schedule is subject to change with ongoing updates throughout the day."
Says a lot.