The only part of the roof at the Flamingo they are working on are the little sections between the buildings of building 7 which have the larger studio/one bed units which is minor. All the other roof work is completed which was imperative prior to and interior electrical work could get started. All wiring was water damaged along with ceilings and walls. I have read many if not all of the negative postings of people saying they see no work being done. That is what they saw and I won't argue that. A lot is being done that the casual observer doesn't see by just driving by and or looking through a fence. I have my contacts and I trust them. They have no reason to feed me false information or doctor the pictures they have sent me of the progress. Now that this Hurricane season is almost over the next phase can be started as the roofing was imperative to get done to protect what remained inside. Take it for what it is.