Re: Orient Construction Update
[Re: mprevo]
#72927
10/29/2015 07:56 AM
10/29/2015 07:56 AM
|
Joined: May 2012
Posts: 680 Burlington, Ontario, Canada
JohnandBev
Traveler
|
Traveler
Joined: May 2012
Posts: 680
Burlington, Ontario, Canada
|
Great pics - Thanks
Lots of progress, I think I see: 1st pod [south end], beginning of wall stain /paint on the siding parking area behind being created - with maybe some power conduits showing on a narrow boulevard by / between the parking areas? last pod [North end], no siding, but roofing started fencing being installed on the rock faced wall and stair framing beginning to be installed sand! below the wall concrete pads between the pods and wall for? - though I think we saw that in a previous pic
Those with better construction knowledge than me will have a better idea of what this means for project status - but to me, if they open the pods as they are done, the 1st group [south end] will be ready by the end of Nov - but is it fair or even enjoyable to patrons to have construction next door - on the other hand the businesses need to get up and running! Thanks again - Jan 28 to Feb 14 for us
J&B
|
|
|
|