|
Forums39
Topics40,376
Posts327,529
Members26,848
|
Most Online4,031 Dec 15th, 2024
|
|
Posts: 549
Joined: February 2001
|
|
13 members (doctorj, MrEZgoin, jonmar, Merky Water, bostonbob, NumberCruncher, MKGrey, EdB, Kennys, goozee, 3 invisible),
577
guests, and
70
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Oct 2015
Posts: 66
Traveler
|
OP
Traveler
Joined: Oct 2015
Posts: 66 |
We just returned from two weeks at LaVista. Here is a rundown on what has been done so far.
New roofs are on and they are metal and a taupe color. Solar panels installed on roofs. Two thirds of the property seem to be complete. New tile floors. New doors and windows. New restrooms at pool area with a new shower also. New sinks in kitchen. Property has been painted. Swimsuit and towel drying racks on balconies. Pool has been converted to salt water. New kitchen at the Hideaway - serving dinner only until a breakfast and lunch cook has been hired. New menu. Brick walkways have all been redone. Draperies have been ordered.
I'm sure that I have missed a few things but the property looks great and fresh.
|
|
|
.
|
|
|
|
|