Hello!
What are the current power cycling (outages) times, durations, and frequencies folks might be seeing at BSV right now?
Thanks!
|
|
|
.
|
|
|
Joined: Mar 2009
Posts: 20,093 Likes: 39
Traveler
|
Traveler
Joined: Mar 2009
Posts: 20,093 Likes: 39 |
Posted daily on the GEGE site.
𝐮𝐧𝐞 𝟐𝟒, 𝟐𝟎𝟐𝟒, 𝗣𝘂𝗯𝗹𝗶𝗰 𝗡𝗼𝘁𝗶𝗰𝗲: 𝗟𝗼𝗮𝗱𝘀𝗵𝗲𝗱𝗱𝗶𝗻𝗴 𝗦𝗰𝗵𝗲𝗱𝘂𝗹𝗲 Below, please find the load-shedding for today, 𝐉𝐮𝐧𝐞 𝟐𝟒, 𝟐𝟎𝟐𝟒. A reminder that each load-shedding period will last for 2 hours (120 minutes). 𝙏𝙝𝙚𝙧𝙚 𝙞𝙨 𝙖 𝙥𝙤𝙨𝙨𝙞𝙗𝙞𝙡𝙞𝙩𝙮 𝙩𝙝𝙖𝙩 𝙨𝙤𝙢𝙚 𝙖𝙧𝙚𝙖𝙨 𝙢𝙖𝙮 𝙚𝙭𝙥𝙚𝙧𝙞𝙚𝙣𝙘𝙚 𝙤𝙪𝙩𝙖𝙜𝙚𝙨 𝙡𝙤𝙣𝙜𝙚𝙧 𝙩𝙝𝙖𝙣 𝙨𝙩𝙖𝙩𝙚𝙙 𝙖𝙣𝙙 𝙢𝙖𝙮 𝙖𝙡𝙨𝙤 𝙗𝙚 𝙞𝙣𝙩𝙚𝙧𝙧𝙪𝙥𝙩𝙚𝙙 𝙢𝙤𝙧𝙚 𝙩𝙝𝙖𝙣 𝙤𝙣𝙘𝙚 𝙙𝙪𝙚 𝙩𝙤 𝙡𝙤𝙖𝙙 𝙘𝙖𝙥𝙖𝙘𝙞𝙩𝙮. Additionally, there may be deviations from the schedule due to varying load demands. 12:07PM to 2:07PM St. Peters, St. Johns, LB Scott Road, Retreat Estate and the surrounding areas. 11:05PM to 1:05PM Pelican, Simpson Bay Resort, and the surrounding areas. 10:44AM to 12:44PM Red Pond, Oyster Pond, Rice Hill, Tamarind Estate, Dawn Beach, Defiance, Middle Region and the surrounding areas. 10:25AM to 12:25PM Mullet Bay, Cupe Coy, and the surrounding areas. 10:14AM to 12:14PM Cy Hill, Cul de Sac, and the surrounding areas. 9:44AM to 11:44AM Belvedere, Dutch Quarter, Bishop Hill, and the surrounding areas.
|
|
|
|
Joined: Aug 2000
Posts: 84,678 Likes: 40
Traveler
|
Traveler
Joined: Aug 2000
Posts: 84,678 Likes: 40 |
Scuba--And GEBE's schedule is almost NEVER correct.
diver--the short answer is you will have no idea when it will be out. On our recent trip, most days it was out 2 to 4:30 ish, but often it was earlier than that, or later than that. A few times it was off more than once. Unacceptable.
Carol Hill
|
|
|
|
|