Hello Nick
I have been following the rebuilding of Leverick Bay and of Virgin Gorda. So nice to see all the local people banding together to get things done.
As you know the South Sound Villa was destroyed. Plans are underway to demolish the existing wood structure down to the concrete lower floor. Then build with concrete up 2 floors. The villa will be much larger and will have 7 bedrooms 8 bathrooms. Will take 6-9 months to rebuild. I will be coming down to the BVI many times during the rebuild. Do you have a room to rent for maybe 4-5 days each trip? So for me another adventure is starting, not one that I wanted but it does let me build and improve on what I built the first time. <img src="http://www.traveltalkonline.com/forums/images/graemlins/Clapping.gif" alt="" />


tpcook