|
Forums39
Topics40,490
Posts328,505
Members26,875
|
Most Online4,031 Dec 15th, 2024
|
|
Posts: 84,886
Joined: August 2000
|
|
|
Joined: Jul 2008
Posts: 244
Traveler
|
Traveler
Joined: Jul 2008
Posts: 244 |
Seems to me that the residents are doing everything as it should be done. Perhaps Minister Doran has not been given the handshake with the bribe that is sometimes required to get things done on that island. It is such a shame that this kind of thing is allowed to go on. How long does it take to sign a permit?? Surely not 14 months.
|
|
|
.
|
|
|
|
|