Traveltalkonline.com Forums


SXM Cruise Schedule TTOL Sponsors SXM Travel Calendar
Forum Statistics
Forums39
Topics38,433
Posts310,114
Members26,538
Most Online2,218
Jan 21st, 2020
Top Posters(30 Days)
RonDon 115
pat 42
Todd 40
jazzgal 40
Member Spotlight
wendyk
wendyk
falmouth,MA
Posts: 1,040
Joined: July 2004
Show All Member Profiles 
Today's Birthdays
LONGISLANDSHARON, Sca2la
Who's Online Now
15 registered members (Colour1, BillR, Wingman, Beansbbq, SANFILIP, PnPinNC, sugarae, michaelj, Mikel, IWIWSE, 5 invisible), 1,057 guests, and 55 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Construction to start on Orient? #184561
02/18/2019 02:01 PM
02/18/2019 02:01 PM
Joined: Aug 2000
Posts: 82,482
Central Florida!
Carol_Hill Offline OP
Traveler
Carol_Hill  Offline OP
Traveler
Joined: Aug 2000
Posts: 82,482
Central Florida!
Jeff Berger's newsletter says that construction is supposed to start soon on the carbets on Orient -- where Chez Leadra, Aloha, etc., were. Can anyone on island confirm that they have seen anything going on there?


Carol Hill
SXM Sponsors
Re: Construction to start on Orient? [Re: Carol_Hill] #184564
02/18/2019 02:20 PM
02/18/2019 02:20 PM
Joined: Mar 2001
Posts: 17,477
Ohio
ruralcarrier Offline
Traveler
ruralcarrier  Offline
Traveler
Joined: Mar 2001
Posts: 17,477
Ohio
I did see some pictures elsewhere recently that appeared to be initial excavation/construction on Orient.


J.D.
Re: Construction to start on Orient? [Re: Carol_Hill] #184568
02/18/2019 03:03 PM
02/18/2019 03:03 PM
Joined: Mar 2009
Posts: 18,571
Auburn, WA
SXMScubaman Offline
Traveler
SXMScubaman  Offline
Traveler
Joined: Mar 2009
Posts: 18,571
Auburn, WA
Was this a recent news letter or a few weeks ago?

Re: Construction to start on Orient? [Re: ruralcarrier] #184569
02/18/2019 03:09 PM
02/18/2019 03:09 PM
Joined: Aug 2000
Posts: 82,482
Central Florida!
Carol_Hill Offline OP
Traveler
Carol_Hill  Offline OP
Traveler
Joined: Aug 2000
Posts: 82,482
Central Florida!
JD--thanks.
Scubaman--Received the newsletter this morning.


Carol Hill
Re: Construction to start on Orient? [Re: Carol_Hill] #184571
02/18/2019 03:15 PM
02/18/2019 03:15 PM
Joined: Mar 2009
Posts: 18,571
Auburn, WA
SXMScubaman Offline
Traveler
SXMScubaman  Offline
Traveler
Joined: Mar 2009
Posts: 18,571
Auburn, WA
Thanks. Mine hasn't come yet. Once I get through all that Skymed promo crap I'll look for that article.

Re: Construction to start on Orient? [Re: Carol_Hill] #184611
02/18/2019 10:17 PM
02/18/2019 10:17 PM
Joined: Mar 2009
Posts: 18,571
Auburn, WA
SXMScubaman Offline
Traveler
SXMScubaman  Offline
Traveler
Joined: Mar 2009
Posts: 18,571
Auburn, WA
Mine just came late afternoon. Not a lot in there I didn't already know. Says construction should be done this May. Pipe dream?

Re: Construction to start on Orient? [Re: Carol_Hill] #184617
02/19/2019 07:01 AM
02/19/2019 07:01 AM
Joined: Nov 2004
Posts: 89
Cmpbellford, Ontario Canada
R
RunnernReader Offline
Traveler
RunnernReader  Offline
Traveler
R
Joined: Nov 2004
Posts: 89
Cmpbellford, Ontario Canada
CONFIRMING! Carole .... and it's a pleasure to see:

Yes the area from ex-Pedro's north for the next 150 yards or so is:
1) all fenced off with orange fence ...further back from the beach than before
2) all dug out by huge cat ... they're going down into foundations this time
3) pipes for water and sewer ... and probably other necessities are being laid and sticking up (not just a pipe DREAM, Scuba man!!! LOL)
4) reinforcing rod is there .... and although I haven't looked in the hole ..I think they've poured some concrete.

AND further down the beach ..in front of Alamanda (sorry I've forgotten the name of the beach bar) .... to the left of the big rocks as you look at it from the beach
5) the site has been prepared by huge cat .... it again is much further back than before
6) and rather than going down as with the nine or so sites near ex-Pedro's .... they seem to be building UP ... so as you approach the site there is a climb of approx. feet higher than the original.... they've piled earth to a higher platform
7) again site is all fenced off and they have lots of building supplies on site.

Good things are happening!

Re: Construction to start on Orient? [Re: Carol_Hill] #184621
02/19/2019 07:25 AM
02/19/2019 07:25 AM
Joined: Nov 2004
Posts: 32
McLean, VA, USA
decaym Offline
Traveler
decaym  Offline
Traveler
Joined: Nov 2004
Posts: 32
McLean, VA, USA
I miss the bars, restaurants, and concessions that were there ten years ago, before the last big rebuild. It had more of an island feel than the big operations further north. Only problem was the beach kept moving around to the point where the bars could only put one or two rows of chairs out front!

Anyway, not what I wanted to talk about. With so many projects happening for both this spot, Club O, and the big operations has anyone considered creating a map of Orient Bay to show what is still closed, what has reopened, and what is currently under construction? Those of us who don't make it down there very often could really benefit from an overview map.

Re: Construction to start on Orient? [Re: RunnernReader] #184622
02/19/2019 08:21 AM
02/19/2019 08:21 AM
Joined: Aug 2000
Posts: 82,482
Central Florida!
Carol_Hill Offline OP
Traveler
Carol_Hill  Offline OP
Traveler
Joined: Aug 2000
Posts: 82,482
Central Florida!
Reader--Great! Thanks for the confirmation.


Carol Hill
Re: Construction to start on Orient? [Re: Carol_Hill] #184659
02/19/2019 12:03 PM
02/19/2019 12:03 PM
Joined: Mar 2009
Posts: 18,571
Auburn, WA
SXMScubaman Offline
Traveler
SXMScubaman  Offline
Traveler
Joined: Mar 2009
Posts: 18,571
Auburn, WA
Good to hear progress is underway.

Re: Construction to start on Orient? [Re: RunnernReader] #184712
02/19/2019 04:58 PM
02/19/2019 04:58 PM
Joined: May 2005
Posts: 307
Chicago, IL
M
Mbrott Offline
Traveler
Mbrott  Offline
Traveler
M
Joined: May 2005
Posts: 307
Chicago, IL
Originally Posted by RunnernReader
CONFIRMING! Carole .... and it's a pleasure to see:

Yes the area from ex-Pedro's north for the next 150 yards or so is:
1) all fenced off with orange fence ...further back from the beach than before
2) all dug out by huge cat ... they're going down into foundations this time
3) pipes for water and sewer ... and probably other necessities are being laid and sticking up (not just a pipe DREAM, Scuba man!!! LOL)
4) reinforcing rod is there .... and although I haven't looked in the hole ..I think they've poured some concrete.

AND further down the beach ..in front of Alamanda (sorry I've forgotten the name of the beach bar) .... to the left of the big rocks as you look at it from the beach
5) the site has been prepared by huge cat .... it again is much further back than before
6) and rather than going down as with the nine or so sites near ex-Pedro's .... they seem to be building UP ... so as you approach the site there is a climb of approx. feet higher than the original.... they've piled earth to a higher platform
7) again site is all fenced off and they have lots of building supplies on site.

Good things are happening!


I'm hoping. Headed down for 10 days in May.